Scope, cost and AI readiness, before any migration starts.
Database modernization
Database modernization for databases you are ready to leave.
Four platforms account for most of the requests we see: Oracle, Greenplum, Teradata and Netezza. Each has its own exit path, and each starts with the same question: what does your code assume about the database?
- Fixed-price assessment first
- Every change engineer-signed
- AceMQ 24/7 after go-live
accounts1.1Mtransactions64.0Mledger12.3Musp_* procs88 objsThe short answer
Database modernization moves data and the code around it off a costly or closing platform onto a supported one. Common exits are Oracle to PostgreSQL, Greenplum to Apache Cloudberry or Postgres-based MPP, and Teradata or Netezza to Snowflake, Databricks or Postgres. Ace8 converts schema and SQL with tools, then engineers prove the data matches.
On this page
- Greenplum
PostgreSQL
Oracle Database
Teradata
Snowflake
Databricks
- Netezza
Apache Cloudberry
AWS
- Greenplum
PostgreSQL
Oracle Database
Teradata
Snowflake
Databricks
- Netezza
Apache Cloudberry
AWS
Overview
Which database exit fits your platform?
The source platform decides the work. This table is the short version. Each row has its own page.
| Source | Typical targets | Hardest part | Page |
|---|---|---|---|
| Oracle Database | PostgreSQL | PL/SQL packages and Oracle-specific SQL | Oracle to PostgreSQL |
| Greenplum | Apache Cloudberry, WarehousePG, Snowflake, Databricks | Choosing between staying and leaving | Stay, upgrade or exit |
| Teradata | Snowflake, Databricks, Postgres-based MPP | BTEQ scripts, macros and Teradata SQL dialect | Teradata migration |
| Netezza | Snowflake, Databricks, Postgres-based MPP | nzsql scripts, distribution design, loaders | Netezza migration |
| Any warehouse | A lakehouse or cloud warehouse | Downstream reports and feeds | Data warehouse modernization |
Scope
What does a database migration include?
Moving rows is the smaller half of the project. The larger half is everything that talks to the database: stored procedures, views, scheduled jobs, load scripts, drivers, reports and the applications themselves. A migration plan lists all of it before any data moves.
- Schema objects: tables, indexes, constraints, sequences, partitions and views.
- Procedural code: PL/SQL, BTEQ, nzsql scripts and stored procedures.
- Data movement: bulk load for history, change capture for cutover.
- Application changes: drivers, connection strings, query dialect.
- Validation: row counts, checksums and report-level comparison.
- Cutover and rollback, rehearsed at least once.
The platforms
Where to start for each platform
How every engagement runs
AI drafts. Engineers decide.
Three phases, the same on every stack. Each one ends with something you can hold us to.
AI-assisted, engineer-verified, one capability at a time.
- import javax.persistence.Entity;+ import jakarta.persistence.Entity;- @Stateless+ @Service
AceMQ engineers support the new stack from day one.
- Test before you touch
- AI drafts, engineers decide
- Strangle, don’t big-bang
- Every step is reversible
- Measure before and after
- Open targets, no new lock-in
- Fixed scope before fixed price
- Plan the run before the cutover
Method
How does Ace8 run a database migration?
The same five steps apply to every source. What changes is the tooling inside each step.
Step 01 of 05
Inventory
Count objects, lines of procedural code, jobs and consumers. Find what is unused.
Step 02 of 05
Choose the target
Match workload shape, data volume, skills and cost to a platform. See the assessment.
Step 03 of 05
Convert
Run schema and code conversion tools, then fix what they flag.
Step 04 of 05
Move and compare
Bulk load, keep in sync with change capture, and compare results against the source.
Step 05 of 05
Cut over
Switch consumers in groups, keep the old system read-only until the comparison holds.
Motive
Why are teams leaving these databases now?
None of these means you must leave. Staying is a legitimate answer, and we say so when the numbers support it.
- Licence and support cost that recurs whatever the usage.
- A vendor decision that changes the product: Broadcom closed the Greenplum source in 2024.
- Appliance hardware reaching end of support.
- A move to cloud or a lakehouse, where the old platform fits poorly.
- Engineers who know the old platform are retiring.
After go-live
Who supports the new database?
Ace8 is the modernization practice of AceMQ. For PostgreSQL, OSSeva provides support so a migration does not leave you with an unsupported database. If Greenplum stays, AceMQ supports it. See supported after migration. For regulated industries, see insurance and financial services.
Customers




Partners



Proof
Delivered by the AceMQ engineering team.
IBM MQ → RabbitMQ
Phased migration with legacy code refactoring
Legacy messaging replaced in phases while the applications calling it were refactored. No big-bang cutover.
1,000+ apps
Spring and Java applications upgraded in 24 hours
A deterministic Spring upgrade process, run through Broadcom’s commercial Spring support, in a single 24-hour window.
IBM MQ out
Proprietary messaging displaced
IBM MQ displaced with an open-source messaging stack, supported by AceMQ.
It is moving data and the code that uses it from an expensive, aging or closing database platform to a supported one. It covers schema, procedural code, data, applications and validation.
Oracle to PostgreSQL, Greenplum to a Postgres-based MPP or a cloud warehouse, and Teradata or Netezza to Snowflake or Databricks.
It depends on object count, procedural code volume and how many consumers read the data. A single application database can take weeks. A warehouse with hundreds of jobs takes months. The assessment gives the range for yours.
Often close to it. Change data capture keeps the target in sync, so the cutover window can be short. Some sources and workloads still need a planned pause.
No. Support for Greenplum continues through AceMQ. The decision is covered on the stay, upgrade or exit page.
AI-assisted tools help convert SQL and procedural code. Deterministic converters such as ora2pg handle much of the mechanical work. Engineers test and review everything.
Start here
Know the cost before anything moves.
A fixed-price assessment gives you the inventory, the risk score and a phased plan. Scope and cost are fixed before the migration starts.
- InventoryEvery application, its stack and what it depends on.
- Risk scoreWhere a change is likely to break, ranked.
- Phased planWhat moves first, which tools lead, and the fixed price.
Get in touch
Talk to a modernization engineer
Tell us what you run today. An engineer, not a sales script, replies within one business day.