Ace8 is the modernization practice of AceMQ.24/7 support from AceMQ after go-live
Book an Assessment

Database modernization

Database modernization for databases you are ready to leave.

Four platforms account for most of the requests we see: Oracle, Greenplum, Teradata and Netezza. Each has its own exit path, and each starts with the same question: what does your code assume about the database?

The short answer

Database modernization moves data and the code around it off a costly or closing platform onto a supported one. Common exits are Oracle to PostgreSQL, Greenplum to Apache Cloudberry or Postgres-based MPP, and Teradata or Netezza to Snowflake, Databricks or Postgres. Ace8 converts schema and SQL with tools, then engineers prove the data matches.

Overview

Which database exit fits your platform?

The source platform decides the work. This table is the short version. Each row has its own page.

SourceTypical targetsHardest partPage
Oracle DatabasePostgreSQLPL/SQL packages and Oracle-specific SQLOracle to PostgreSQL
GreenplumApache Cloudberry, WarehousePG, Snowflake, DatabricksChoosing between staying and leavingStay, upgrade or exit
TeradataSnowflake, Databricks, Postgres-based MPPBTEQ scripts, macros and Teradata SQL dialectTeradata migration
NetezzaSnowflake, Databricks, Postgres-based MPPnzsql scripts, distribution design, loadersNetezza migration
Any warehouseA lakehouse or cloud warehouseDownstream reports and feedsData warehouse modernization

Scope

What does a database migration include?

Moving rows is the smaller half of the project. The larger half is everything that talks to the database: stored procedures, views, scheduled jobs, load scripts, drivers, reports and the applications themselves. A migration plan lists all of it before any data moves.

  • Schema objects: tables, indexes, constraints, sequences, partitions and views.
  • Procedural code: PL/SQL, BTEQ, nzsql scripts and stored procedures.
  • Data movement: bulk load for history, change capture for cutover.
  • Application changes: drivers, connection strings, query dialect.
  • Validation: row counts, checksums and report-level comparison.
  • Cutover and rollback, rehearsed at least once.

Method

How does Ace8 run a database migration?

The same five steps apply to every source. What changes is the tooling inside each step.

  1. 1

    Inventory

    Count objects, lines of procedural code, jobs and consumers. Find what is unused.

  2. 2

    Choose the target

    Match workload shape, data volume, skills and cost to a platform. See the assessment.

  3. 3

    Convert

    Run schema and code conversion tools, then fix what they flag.

  4. 4

    Move and compare

    Bulk load, keep in sync with change capture, and compare results against the source.

  5. 5

    Cut over

    Switch consumers in groups, keep the old system read-only until the comparison holds.

Motive

Why are teams leaving these databases now?

None of these means you must leave. Staying is a legitimate answer, and we say so when the numbers support it.

  • Licence and support cost that recurs whatever the usage.
  • A vendor decision that changes the product: Broadcom closed the Greenplum source in 2024.
  • Appliance hardware reaching end of support.
  • A move to cloud or a lakehouse, where the old platform fits poorly.
  • Engineers who know the old platform are retiring.

After go-live

Who supports the new database?

Ace8 is the modernization practice of AceMQ. For PostgreSQL, OSSeva provides support so a migration does not leave you with an unsupported database. If Greenplum stays, AceMQ supports it. See supported after migration. For regulated industries, see insurance and financial services.

FAQ

Frequently asked.

Something else on your mind? Ask an engineer.

It is moving data and the code that uses it from an expensive, aging or closing database platform to a supported one. It covers schema, procedural code, data, applications and validation.

Know the cost before anything moves.

A fixed-price assessment gives you the inventory, the risk score and a phased plan. Scope and cost are fixed before the migration starts.

Book a Fixed-Price Assessment

Get in touch

Talk to a modernization engineer

Tell us what you run today. An engineer, not a sales script, replies within one business day.

305-204-2607info@ace8.io

66 W. Flagler St. 9th Floor
Miami, FL 33130

What are you moving off? *

Fixed price. Scope and cost before any migration starts.