Scope, cost and AI readiness, before any migration starts.
Guides
Modernization guides written by the engineers who do the work.
Patterns, comparisons and cost math for teams planning a move off legacy Java, app servers and databases.
- Fixed-price assessment first
- Every change engineer-signed
- AceMQ 24/7 after go-live
The short answer
These guides explain the decisions behind a modernization project: which Java version to target, whether to leave an app server, how AI-assisted refactoring compares with recipes, when to split a monolith, and what a database exit costs. Each guide ends with the service page that turns the decision into a plan.
On this page
Java
WebLogic
Oracle Database
AWS Transform
.NET
JBoss EAP
Tomcat
- OpenRewrite
Maven
Gradle
- WebSphere
- Jakarta EE
Strategy
Plan the modernization
AI-assisted
Use AI tools without losing control
Java and app servers
Upgrade Java and leave the app server
How every engagement runs
AI drafts. Engineers decide.
Three phases, the same on every stack. Each one ends with something you can hold us to.
AI-assisted, engineer-verified, one capability at a time.
- import javax.persistence.Entity;+ import jakarta.persistence.Entity;- @Stateless+ @Service
AceMQ engineers support the new stack from day one.
- Test before you touch
- AI drafts, engineers decide
- Strangle, don’t big-bang
- Every step is reversible
- Measure before and after
- Open targets, no new lock-in
- Fixed scope before fixed price
- Plan the run before the cutover
Next step
Turn a guide into a plan
Ace8 is the AI-assisted application modernization practice of AceMQ. The modernization assessment inventories your applications, measures test coverage and risk, and returns a phased roadmap.
Customers




Partners



Proof
Delivered by the AceMQ engineering team.
IBM MQ → RabbitMQ
Phased migration with legacy code refactoring
Legacy messaging replaced in phases while the applications calling it were refactored. No big-bang cutover.
1,000+ apps
Spring and Java applications upgraded in 24 hours
A deterministic Spring upgrade process, run through Broadcom’s commercial Spring support, in a single 24-hour window.
IBM MQ out
Proprietary messaging displaced
IBM MQ displaced with an open-source messaging stack, supported by AceMQ.
The AceMQ engineering team, from the tools and patterns used on modernization projects. Each guide lists what still needs a first-party test.
Yes. Link to them, share them, use the checklists internally.
With the guide that matches your next decision. If you do not know which decision comes first, start with the modernization assessment.
Start here
Know the cost before anything moves.
A fixed-price assessment gives you the inventory, the risk score and a phased plan. Scope and cost are fixed before the migration starts.
- InventoryEvery application, its stack and what it depends on.
- Risk scoreWhere a change is likely to break, ranked.
- Phased planWhat moves first, which tools lead, and the fixed price.
Get in touch
Talk to a modernization engineer
Tell us what you run today. An engineer, not a sales script, replies within one business day.