Ace8 is the modernization practice of AceMQ.24/7 support from AceMQ after go-live
Book an Assessment
OfferSoftware project rescue

Software project rescue: audit it, stabilise it, ship it.

AceMQ engineers take over a stalled vendor project or an AI-built app, audit it first, then add tests and a deploy pipeline and get it to production. Quote on request.

  • A written report and a plan
  • Quote on request
  • Engineer-led, not tool-only
rescue · booking-appAudit first, then stabilise
  1. Auditwhat the codebase hides
  2. Freezerisky changes paused
  3. Testssafety net on the critical paths
  4. Pipelinebuild and deploy made repeatable
  5. Shipfirst release to real users
OrderEntity.java- import javax.persistence.Entity;+ import jakarta.persistence.Entity;- @Stateless+ @Service
  • Build
  • Tests match baseline
  • Senior engineer sign-off
Illustrative run. Names and figures are examples, not client data.

Stacks we work in

  • Java
  • Spring Boot
  • Kubernetes
  • PostgreSQL
  • Kafka
  • Docker
  • Terraform
  • GitHub Actions
  • Java
  • Spring Boot
  • Kubernetes
  • PostgreSQL
  • Kafka
  • Docker
  • Terraform
  • GitHub Actions
The short answer

Software project rescue means taking over code that has stalled or that was never ready for real users, and getting it to production. Ace8 starts with a code audit, freezes risky changes, adds tests and a deploy pipeline, then decides with you whether to fix or rebuild. The rescue audit has a fixed price agreed after a scoping call.

Situations

What kinds of projects do you rescue?

Two situations account for most rescues, and they need slightly different handling.

SituationWhat it looks likeFirst concern
A vendor project that stalledMissed dates, a team that left, code nobody on your side understands, a budget half spentWhat exists, what works and what the next step costs. See the vendor handover checklist
An AI-built app heading to real usersA working prototype made with Lovable, Bolt, Replit or Cursor, now needed for customers and real dataWhether it is safe to launch. See the production checklist and the security review guide

Method

What happens at the start of a rescue?

The start of a rescue follows the same four steps in every case, and the first one is an audit.

Step 01 of 04

Audit

A code audit reads the code and reports what is there, what is risky and what to fix first.

Decision

Should you fix the code or rebuild it?

Fix it when the structure is sound and the problems are in the details. Rebuild when the structure itself is what is wrong. The audit gives the evidence for that call, and we show you the findings behind it.

01

Fix when the architecture is understandable, the data model is sensible and the main flows can be covered by tests.

02

Rebuild when changes in one place break unrelated places, the data model cannot hold what the business needs, or the code cannot be built and run by anyone but its author.

03

Mixed answers are common

Keep the data and the working parts, rebuild the part that fights you.

04

If the finding is a platform problem, the legacy application modernization route may fit better than a patch.

How it runs

Assess, modernize, run. One team throughout.

Ace8 scopes and delivers the move. AceMQ engineers support the new stack 24/7 from day one.

01Fixed price

Assess

Scope, cost and AI readiness, before any migration starts. Characterization tests and a baseline before we touch a line.

02Ace8

Modernize

AI-assisted, engineer-verified, one capability at a time. Tools draft the rewrite and a senior engineer signs every change.

03AceMQ · 24/7

Run

Tested, reversible cutover. AceMQ engineers support the new stack from day one. Supported after migration →

Pricing

What does a software rescue cost and how long does it take?

Quote on request. The rescue audit has a fixed price agreed after a scoping call, and later work is priced from what the audit finds. Timing is agreed at scoping and depends on code size and how quickly we get access. Our guide on software rescue cost explains the drivers.

These factors change the price:

Code size, languages and whether the code builds at all

Existing tests and documentation, or the lack of them

How much of the code was generated by AI tools

What users and data are already live

How quickly the previous team or owner can answer questions

A rough guide to scope, not a price
Effort positionQualitative
Typical
LighterTypicalHeavier
Pushing the scope up
Nothing at the top setting
PriceQuote on request
Request a rescue audit

Honest fit

When is a rescue not the right answer?

A rescue is not the right answer when the idea is still unproven.

  1. 01

    If an AI-built prototype is being used to test demand and has no real users or data, keep prototyping and audit it before you launch.

  2. 02

    It is also not the right answer when you simply need extra engineers on your own team. We take on a defined outcome, not open-ended seats.

Platforms we work with
  • Java
  • Spring Boot
  • Tomcat
  • WebLogic
  • WebSphere
  • JBoss EAP
  • Jakarta EE
  • Kubernetes
  • PostgreSQL
  • OpenRewrite
  • AWS Transform
Partners
  • Broadcom
  • VMware Tanzu
  • Redis
  • OSSeva
Recognition

Broadcom Expert Advantage Tanzu Services Partner of the Year, AMER, 2025 · awarded to the AceMQ engineering team

Proof

Delivered by the AceMQ engineering team.

The engineers behind Ace8 are the AceMQ team, and this is work they delivered. Ace8 is the new name for that practice, not a new team.

Case studyDelivered by the AceMQ engineering team

IBM MQ → RabbitMQ

Phased migration with legacy code refactoring

Legacy messaging replaced in phases while the applications calling it were refactored. No big-bang cutover; each phase reviewed before the next.

American NationalRead the case study
RecognitionBroadcom Expert Advantage Tanzu Services Partner of the Year, AMER, 2025Awarded to the AceMQ engineering team
Since2016Senior engineers working on the platforms enterprises run their business on
After go-liveAceMQ supports the new stack 24/7Supported after migration

FAQ

Frequently asked questions

Short answers to what buyers ask first. Something else on your mind? Ask an engineer.

Yes, if we can get read access to the code. We start with a code audit so we know what we are taking on, and we sign an NDA before access. Stacks we take on are confirmed at scoping.

Start here

Know the cost before anything moves.

A fixed-price assessment gives you the inventory, the risk score and a phased plan. Scope and cost are fixed before the migration starts.

Inventory
Every application, its stack and what it depends on.
Risk score
Where a change is likely to break, ranked.
Phased plan
What moves first, which tools lead, and the fixed price.

Get in touch

Talk to a modernization engineer.

Tell us what you run today. An engineer, not a sales script, replies within one business day.

305-204-2607info@ace8.io

66 W. Flagler St. 9th Floor
Miami, FL 33130

Fixed price, agreed after a short scoping call.