Scope, cost and AI readiness, before any migration starts.
Kubernetes replatforming
Replatform Java to Kubernetes without rewriting it.
Most applications can move with targeted changes. The work is in state, configuration and operations, not in the business logic.
- Fixed-price assessment first
- Every change engineer-signed
- AceMQ 24/7 after go-live
- Routed behind a stable interface
- Rollback tested
The short answer
Replatforming to Kubernetes means running an existing application in containers on a cluster with limited code change. For Java this usually means moving off an application server, externalizing configuration and state, adding health checks and building a container image. Ace8 does the code work in slices and checks each step with tests.
On this page
Kubernetes
Java
- Konveyor
WebLogic
- WebSphere
Kubernetes
Java
- Konveyor
WebLogic
- WebSphere
Definition
What is replatforming, and how is it different from rehosting or refactoring?
Replatforming sits in the middle. It gets most of the operational benefit of Kubernetes at much lower risk than a refactor. If you do want to split a system, see monolith to microservices.
| Approach | What changes | Typical use |
|---|---|---|
| Rehost | Nothing in the code. The VM moves. | Quick exit from a data center |
| Replatform | Runtime, packaging and configuration. Little business code. | Move to containers and Kubernetes |
| Refactor | Application structure, such as splitting services. | When the design blocks change |
Readiness
What stops a Java application running on Kubernetes?
Most of these are found by static analysis plus a read-through by an engineer. Tools such as Konveyor can list them across a portfolio.
- Application server dependence: JNDI lookups, server-managed data sources and server-specific deployment descriptors.
- Local state: sessions held in memory, files written to local disk, scheduled jobs that assume one instance.
- Hard-coded configuration: host names, file paths and credentials in the code or the build.
- Old Java versions with poor container awareness of CPU and memory limits.
- No health endpoints, so the cluster cannot tell a stuck process from a healthy one.
- Long start-up and shutdown behavior that conflicts with rolling updates.
Method
How do we replatform an application?
Step 01 of 05
Assess
Score each application for readiness. Some are easy, some need an upgrade first, a few should stay where they are.
Step 02 of 05
Upgrade the runtime
Move to a current Java version and, where it helps, off the application server. See Java modernization.
Step 03 of 05
Externalize state and config
Move sessions, files and settings out of the application so many copies can run.
Step 04 of 05
Containerize
Build a small, reproducible image with health checks. See application containerization.
Step 05 of 05
Deploy alongside the old system
Run both, compare behavior, then move traffic gradually with a rollback ready.
How every engagement runs
AI drafts. Engineers decide.
Three phases, the same on every stack. Each one ends with something you can hold us to.
AI-assisted, engineer-verified, one capability at a time.
- import javax.persistence.Entity;+ import jakarta.persistence.Entity;- @Stateless+ @Service
AceMQ engineers support the new stack from day one.
- Test before you touch
- AI drafts, engineers decide
- Strangle, don’t big-bang
- Every step is reversible
- Measure before and after
- Open targets, no new lock-in
- Fixed scope before fixed price
- Plan the run before the cutover
Judgment
Which applications should not move to Kubernetes?
A good assessment says which ones to leave. Moving everything is not the goal.
- Stable, low-change applications with no pressing reason to move, where the cost exceeds the benefit.
- Applications tied to hardware or to a vendor product that is not supported in containers.
- Heavy stateful systems with no clear operating model for persistent storage.
- Applications near retirement.
Run
Who runs the cluster afterwards?
A platform change moves operational work to whoever owns the cluster: upgrades, security patches, capacity, monitoring. Decide this before cutover. Ace8 does the migration. AceMQ supports the open-source stack afterwards, including the container and messaging components. See supported after migration. We are not a managed Kubernetes provider, and we say so up front.
Evidence
What have we measured?
We have not published figures on container start-up, memory use or cutover effort for a sample application yet. When we do, they will be labeled with the application, the Java version and the cluster used. Until then this page claims none.
- Files changed
- Pending
- Tests before and after
- Pending
- Manual fixes
- Pending
- Engineer review time
- Pending
Results publish here when the run completes. No figures until then.
Customers




Partners



Proof
Delivered by the AceMQ engineering team.
IBM MQ → RabbitMQ
Phased migration with legacy code refactoring
Legacy messaging replaced in phases while the applications calling it were refactored. No big-bang cutover.
1,000+ apps
Spring and Java applications upgraded in 24 hours
A deterministic Spring upgrade process, run through Broadcom’s commercial Spring support, in a single 24-hour window.
IBM MQ out
Proprietary messaging displaced
IBM MQ displaced with an open-source messaging stack, supported by AceMQ.
Running an existing application in containers on Kubernetes with limited code change, mainly to packaging, configuration and state. It differs from a rewrite or a service split.
Often yes, after removing application server dependence, externalizing state and configuration, and adding health checks. Some applications need a Java upgrade first.
Not always, as some servers can run in containers, but exiting the server usually simplifies the move and removes licence cost. The assessment decides per application.
No. Stable, low-change or hardware-bound applications may be better left where they are.
No. We do the migration. AceMQ supports the open-source components afterwards, and you decide who owns the cluster.
Start here
Know the cost before anything moves.
A fixed-price assessment gives you the inventory, the risk score and a phased plan. Scope and cost are fixed before the migration starts.
- InventoryEvery application, its stack and what it depends on.
- Risk scoreWhere a change is likely to break, ranked.
- Phased planWhat moves first, which tools lead, and the fixed price.
Get in touch
Talk to a modernization engineer
Tell us what you run today. An engineer, not a sales script, replies within one business day.