Ace8 is the modernization practice of AceMQ.24/7 support from AceMQ after go-live
Book an Assessment

Greenplum to Cloudberry

Greenplum to Apache Cloudberry: the closest-fit migration.

Cloudberry continues from the Greenplum codebase, so most SQL and design choices carry over. The work is in the version gap, the tooling around it and proving results match.

  • Fixed-price assessment first
  • Every change engineer-signed
  • AceMQ 24/7 after go-live
analytics · cloudberryparallel run
Greenplum 6Apache Cloudberry
Comparing results on both systems…
Illustrative run. Names and figures are examples, not client data.

The short answer

Migrating Greenplum to Apache Cloudberry moves your warehouse to an open-source MPP database forked from Greenplum. Most SQL, distribution keys and table designs carry over. Ace8 checks compatibility against your Greenplum version, moves data in parallel, rebuilds loaders and external tables, then validates results before cutover.

Stacks we work in

  • Greenplum
  • Apache Cloudberry
  • PostgreSQL
  • Python
  • Oracle Database
  • Snowflake
  • Databricks
  • Spark
  • Airflow
  • dbt

Fit

Why is Cloudberry the lowest-effort Greenplum exit?

Cloudberry started from the Greenplum source and keeps its architecture: a coordinator, parallel segment hosts, distribution keys and append-optimized storage. That means your table designs and most of your SQL do not need rethinking. By contrast, a move to a cloud warehouse changes the design model. See Greenplum alternatives for the wider comparison and the decision guide for whether to leave at all.

The fit is closest when your Greenplum version is near the version Cloudberry tracks. A big version gap means a stepped upgrade first, or accepting some rework.

Check first

What do you check before migrating?

AreaWhat to checkWhy it matters
Version lineageYour Greenplum major version against what Cloudberry tracksDecides how much runs unchanged
ExtensionsPostGIS, MADlib, PL/Python, PL/R, custom extensionsEach must exist and behave on the target
External tables and gpfdistEvery loader, its format and its scheduleLoaders are the usual rework
Resource managementResource groups or queues and role mappingConcurrency tuning is rebuilt, not copied
Query plansHeaviest 50 queries, including GPORCA usePlans can differ; test early
Backup and recoverygpbackup jobs and retention policyOperations scripts change
Connected toolsBI, ETL, drivers and monitoringConnection and catalog differences surface here

Want this mapped for your applications? Get a fixed scope and price before anything moves.

Execution

How is the data moved?

Data moves segment to segment in parallel where possible, or through backup and restore tooling or external-table loads for very large tables. The choice depends on network, size and the downtime window. For tables that change during the move, we capture changes or reload the delta.

Step 01 of 06

Stand up the target

Build a Cloudberry cluster sized from your Greenplum workload, not from a guess.

How every engagement runs

AI drafts. Engineers decide.

Three phases, the same on every stack. Each one ends with something you can hold us to.

Fixed priceAssess

Scope, cost and AI readiness, before any migration starts.

Assessment summary
Applications mapped
Risk scored
Phased plan
Price fixed
Ace8Modernize

AI-assisted, engineer-verified, one capability at a time.

upgrade: javax to jakarta
- import javax.persistence.Entity;+ import jakarta.persistence.Entity;- @Stateless+ @Service
AI draftEngineer approved
AceMQ · 24/7Run

AceMQ engineers support the new stack from day one.

ProductionOperational
On call: the team that ran the migration
  • Test before you touch
  • AI drafts, engineers decide
  • Strangle, don’t big-bang
  • Every step is reversible
  • Measure before and after
  • Open targets, no new lock-in
  • Fixed scope before fixed price
  • Plan the run before the cutover
Read the 8 principles

Proof

How do we prove the results match?

Each check is recorded. The comparison log is part of the handover.

  • Row counts and column checksums for every table.
  • Report-level diffs on the queries the business actually reads.
  • Timing of the heaviest queries, before and after.
  • A defined rollback that has been run once, not just written.

After go-live

Who supports Cloudberry afterward?

Cloudberry is open source, so support is a plan you make, not a default. Ace8 writes the run plan before cutover. See supported after migration. If, after the assessment, staying on Greenplum looks better, AceMQ supports it: AceMQ Greenplum pages. The wider context is on the database modernization page.

Customers

Henry Schein DentalEnbridgeGojekMicrosoft

Partners

BroadcomRedisVMwareOSSeva

Proof

Delivered by the AceMQ engineering team.

IBM MQ → RabbitMQ

Phased migration with legacy code refactoring

Legacy messaging replaced in phases while the applications calling it were refactored. No big-bang cutover.

American NationalDelivered by the AceMQ engineering team

1,000+ apps

Spring and Java applications upgraded in 24 hours

A deterministic Spring upgrade process, run through Broadcom’s commercial Spring support, in a single 24-hour window.

Global financial institutionDelivered by the AceMQ engineering team

IBM MQ out

Proprietary messaging displaced

IBM MQ displaced with an open-source messaging stack, supported by AceMQ.

Global technology enterpriseDelivered by the AceMQ engineering team

FAQ

Frequently asked questions

Something else on your mind? Ask an engineer.

Check version and extension compatibility, build the target, move the data in parallel, rebuild external tables and loaders, run both in parallel and compare, then cut over.

Start here

Know the cost before anything moves.

A fixed-price assessment gives you the inventory, the risk score and a phased plan. Scope and cost are fixed before the migration starts.

  • InventoryEvery application, its stack and what it depends on.
  • Risk scoreWhere a change is likely to break, ranked.
  • Phased planWhat moves first, which tools lead, and the fixed price.

Get in touch

Talk to a modernization engineer

Tell us what you run today. An engineer, not a sales script, replies within one business day.

305-204-2607info@ace8.io

66 W. Flagler St. 9th Floor
Miami, FL 33130

What are you moving off? *

Fixed price. Scope and cost before any migration starts.