Scope, cost and AI readiness, before any migration starts.
Greenplum to Cloudberry
Greenplum to Apache Cloudberry: the closest-fit migration.
Cloudberry continues from the Greenplum codebase, so most SQL and design choices carry over. The work is in the version gap, the tooling around it and proving results match.
- Fixed-price assessment first
- Every change engineer-signed
- AceMQ 24/7 after go-live
events4.8Bsessions620Musers31Mudf_*64 objsThe short answer
Migrating Greenplum to Apache Cloudberry moves your warehouse to an open-source MPP database forked from Greenplum. Most SQL, distribution keys and table designs carry over. Ace8 checks compatibility against your Greenplum version, moves data in parallel, rebuilds loaders and external tables, then validates results before cutover.
Stacks we work in
- Greenplum
Apache Cloudberry
PostgreSQL
Python
Oracle Database
Snowflake
Databricks
Spark
Airflow
dbt
Fit
Why is Cloudberry the lowest-effort Greenplum exit?
Cloudberry started from the Greenplum source and keeps its architecture: a coordinator, parallel segment hosts, distribution keys and append-optimized storage. That means your table designs and most of your SQL do not need rethinking. By contrast, a move to a cloud warehouse changes the design model. See Greenplum alternatives for the wider comparison and the decision guide for whether to leave at all.
The fit is closest when your Greenplum version is near the version Cloudberry tracks. A big version gap means a stepped upgrade first, or accepting some rework.
Check first
What do you check before migrating?
| Area | What to check | Why it matters |
|---|---|---|
| Version lineage | Your Greenplum major version against what Cloudberry tracks | Decides how much runs unchanged |
| Extensions | PostGIS, MADlib, PL/Python, PL/R, custom extensions | Each must exist and behave on the target |
| External tables and gpfdist | Every loader, its format and its schedule | Loaders are the usual rework |
| Resource management | Resource groups or queues and role mapping | Concurrency tuning is rebuilt, not copied |
| Query plans | Heaviest 50 queries, including GPORCA use | Plans can differ; test early |
| Backup and recovery | gpbackup jobs and retention policy | Operations scripts change |
| Connected tools | BI, ETL, drivers and monitoring | Connection and catalog differences surface here |
Execution
How is the data moved?
Data moves segment to segment in parallel where possible, or through backup and restore tooling or external-table loads for very large tables. The choice depends on network, size and the downtime window. For tables that change during the move, we capture changes or reload the delta.
Step 01 of 06
Stand up the target
Build a Cloudberry cluster sized from your Greenplum workload, not from a guess.
Step 02 of 06
Recreate schema
Generate DDL from the source, review distribution keys and storage options, and apply.
Step 03 of 06
Load history
Copy tables in parallel and record counts and checksums.
Step 04 of 06
Rebuild loaders
Rewrite external tables, gpload jobs and scheduler entries.
Step 05 of 06
Run in parallel
Run the same reports on both clusters and diff the results.
Step 06 of 06
Cut over
Switch consumers in groups and keep Greenplum read-only until the diff holds.
How every engagement runs
AI drafts. Engineers decide.
Three phases, the same on every stack. Each one ends with something you can hold us to.
AI-assisted, engineer-verified, one capability at a time.
- import javax.persistence.Entity;+ import jakarta.persistence.Entity;- @Stateless+ @Service
AceMQ engineers support the new stack from day one.
- Test before you touch
- AI drafts, engineers decide
- Strangle, don’t big-bang
- Every step is reversible
- Measure before and after
- Open targets, no new lock-in
- Fixed scope before fixed price
- Plan the run before the cutover
Proof
How do we prove the results match?
Each check is recorded. The comparison log is part of the handover.
- Row counts and column checksums for every table.
- Report-level diffs on the queries the business actually reads.
- Timing of the heaviest queries, before and after.
- A defined rollback that has been run once, not just written.
After go-live
Who supports Cloudberry afterward?
Cloudberry is open source, so support is a plan you make, not a default. Ace8 writes the run plan before cutover. See supported after migration. If, after the assessment, staying on Greenplum looks better, AceMQ supports it: AceMQ Greenplum pages. The wider context is on the database modernization page.
Customers




Partners



Proof
Delivered by the AceMQ engineering team.
IBM MQ → RabbitMQ
Phased migration with legacy code refactoring
Legacy messaging replaced in phases while the applications calling it were refactored. No big-bang cutover.
1,000+ apps
Spring and Java applications upgraded in 24 hours
A deterministic Spring upgrade process, run through Broadcom’s commercial Spring support, in a single 24-hour window.
IBM MQ out
Proprietary messaging displaced
IBM MQ displaced with an open-source messaging stack, supported by AceMQ.
Check version and extension compatibility, build the target, move the data in parallel, rebuild external tables and loaders, run both in parallel and compare, then cut over.
Closer to it than any other exit, but not a copy. Version gaps, extensions, loaders and resource settings still need work.
To plain PostgreSQL, only for smaller warehouses. For parallel workloads, move to an MPP such as Cloudberry or WarehousePG.
It is another Greenplum-derived option with vendor support. The migration steps are similar. See the alternatives page.
Evaluate it on your workload. We run a proof on your heaviest queries before recommending it, and we check the project's current release status.
A short cutover window, usually. Running both clusters in parallel keeps the pause small.
Start here
Know the cost before anything moves.
A fixed-price assessment gives you the inventory, the risk score and a phased plan. Scope and cost are fixed before the migration starts.
- InventoryEvery application, its stack and what it depends on.
- Risk scoreWhere a change is likely to break, ranked.
- Phased planWhat moves first, which tools lead, and the fixed price.
Get in touch
Talk to a modernization engineer
Tell us what you run today. An engineer, not a sales script, replies within one business day.