Ace8 is the modernization practice of AceMQ.24/7 support from AceMQ after go-live
Book an Assessment

JBoss EAP migration

JBoss EAP migration to Tomcat or Spring Boot.

Most of the work is configuration. Read your standalone.xml first and the plan follows from it.

The short answer

A JBoss EAP migration moves applications to Tomcat or Spring Boot and removes the EAP subscription. Most of the work is configuration: standalone.xml or domain.xml, JBoss modules, CLI scripts and CDI wiring. Ace8 maps these, tests behavior, then migrates in phases with AI-assisted code changes that engineers verify.

Start here

Reading standalone.xml: configuration mapping

On JBoss EAP, the server file describes subsystems: data sources, messaging, security domains, logging and more. Each subsystem becomes either application properties, a library or a separate service. This is how we read it.

EAP configurationBecomesNote
datasources subsystemspring.datasource properties or a Tomcat resourcePool sizes and validation queries carry over
messaging (Artemis) subsystemA standalone broker and Spring messaging, or an embedded ArtemisDecide whether the broker stays inside the app
security domainsSpring Security or container authenticationRole mapping and login modules
logging subsystemLogging configuration in the applicationCategories and levels
undertow subsystemEmbedded server settingsContext paths, HTTP limits, TLS
JBoss modulesOrdinary dependencies in the buildModule-level classpath tricks need unpicking
CLI scripts (jboss-cli)Pipeline steps and configuration in codeRead them: they record the server's history
CDI beans and EJBsSpring beans or kept as CDI where it fitsScope and transaction handling

Choosing

EAP, WildFly or Tomcat

WildFly is the community project that EAP is built from. It removes the subscription but keeps the full application server model and the same operational burden. Tomcat or Spring Boot removes more.

EAPWildFlyTomcatSpring Boot
SubscriptionYesNoNoNo
Full Jakarta EE serverYesYesNoNo
Code change from EAPNoneSmall, but version-dependentModerateLargest up front
Supported by the vendorRed HatCommunityCommunity, plus AceMQ supportCommunity, plus AceMQ support

Motive

Why teams leave JBoss EAP

  • The subscription is an annual cost for software the team may use lightly.
  • Version upgrades of the server force code changes anyway.
  • Containers favor a smaller runtime.
  • A move to Spring Boot is often the next step after a Java upgrade.

Cost

Subscription cost model

We build the comparison from your subscription terms and core count against the cost of the target. The formula and sources are shown. A worked model will be published on this page, and we do not quote a saving before we have your numbers.

Plan

Phased cutover

  1. 1

    Inventory subsystems

    List what each application actually uses.

  2. 2

    Write tests

    Characterization tests for transactions, security and messaging.

  3. 3

    Move code and config

    Tools do the repetitive edits. Engineers sign each change.

  4. 4

    Run side by side

    Traffic moves in steps, one application at a time.

  5. 5

    Cancel the subscription

    After the last application has moved and the rollback window is over.

Risk

Risks and rollback

Rollback means routing traffic back to the EAP instance, which stays up until the new one has carried load.

  • Classpath behavior that depended on module ordering.
  • Transaction behavior that the container supplied silently.
  • Security domain differences that surface under real logins.
  • Subscription renewal dates that constrain the schedule.

After go-live

After go-live

AceMQ supports Tomcat, Java and Spring around the clock. See supported after migration.

After go-live

Keep it running after cutover.

FAQ

Frequently asked.

Something else on your mind? Ask an engineer.

WildFly is the community project that EAP is based on. EAP adds a subscription with vendor support. WildFly removes the cost but keeps the application server model.

Know the cost before anything moves.

A fixed-price assessment gives you the inventory, the risk score and a phased plan. Scope and cost are fixed before the migration starts.

Book a Fixed-Price Assessment

Get in touch

Talk to a modernization engineer

Tell us what you run today. An engineer, not a sales script, replies within one business day.

305-204-2607info@ace8.io

66 W. Flagler St. 9th Floor
Miami, FL 33130

What are you moving off? *

Fixed price. Scope and cost before any migration starts.